Links, Timeline and Other Information

Monday 29 June 2015

Certified Plans


We have now completed the plans for the private certifier. These plans are expected to receive the construction certficate.
It has been a long road to get to this point with some last minutes changes as a result of the hydraulic design and subsequent variations on the external design.
Today we signed the last plan (and variations) that will be the specified plan for construction.

Ground floor layout

First floor layout

Front elevation (north facing)

Side boundary elevation (east facing)

Rear elevation (South facing)

Side boundary elevation (West facing)
We are keen to meet our construction team and begin the construction. Let the build begin!

No comments:

Post a Comment

Note: only a member of this blog may post a comment.