We have now completed the plans for the private certifier. These plans are expected to receive the construction certficate.
It has been a long road to get to this point with some last minutes changes as a result of the hydraulic design and subsequent variations on the external design.
Today we signed the last plan (and variations) that will be the specified plan for construction.
|  | 
| Ground floor layout | 
|  | 
| First floor layout | 
|  | 
| Front elevation (north facing) | 
|  | 
| Side boundary elevation (east facing) | 
|  | 
| Rear elevation (South facing) | 
|  | 
| Side boundary elevation (West facing) | 
We are keen to meet our construction team and begin the construction. Let the build begin!
 
No comments:
Post a Comment
Note: only a member of this blog may post a comment.