We have now completed the plans for the private certifier. These plans are expected to receive the construction certficate.
It has been a long road to get to this point with some last minutes changes as a result of the hydraulic design and subsequent variations on the external design.
Today we signed the last plan (and variations) that will be the specified plan for construction.
|
Ground floor layout |
|
First floor layout |
|
Front elevation (north facing) |
|
Side boundary elevation (east facing) |
|
Rear elevation (South facing) |
|
Side boundary elevation (West facing) |
We are keen to meet our construction team and begin the construction. Let the build begin!
No comments:
Post a Comment
Note: only a member of this blog may post a comment.