Since our initial discussion with our Site Supervisor last week, we can now see things are moving. The site fencing, toilet, sediment control and most importantly the surveyors pegs are now onsite.
|
Sediment control |
| | |
Site rubbish area |
|
Peg - Front setback |
|
Peg - Relative Level (West Boundary) |
We should start to see some earth movement and site-preparation next week.
Still need a skip and some more gravel for all weather access. At this
stage though, our Site Supervisor is awaiting confirmation from the Excavator, Plumber and Concrete contractors to confirm their availability. He expects this to come through tomorrow.